-
Established in March 2008 in China.
Received ISO9001/ISO14001 certificates
2008
-
Obtained TUV certificate in 2010 and build 80MW production line in Jiangsu
2010
-
Upgraded the construction and expanded its solar module production line from 80MW to 150MW.Sales volume grows constantly
2012
-
Total module capacity of Nuuko Power exceeded 800MW in China.Anhui Science and Technology Award
2014
-
Launched MBB half cell solar module auto production line ,and build 2.5GW workshop.
2016
-
Won the title "leader" of photovoltaic module ,and Shandong 18MW solar plant were completed.
2018
-
A total of 523 households were successfully connected to the grid throughout the year, and the residents' annual profit reached 22.2%.
2019
-
R&D independently to achieve the reutilization of light absorption and increase energy generation.
2020
2008
-
Established in March 2008 in China.
Received ISO9001/ISO14001 certificates
2010
-
Obtained TUV certificate in 2010 and build 80MW production line in Jiangsu
2012
-
Upgraded the construction and expanded its solar module production line from 80MW to 150MW.Sales volume grows constantly
2014
-
Total module capacity of Nuuko Power exceeded 800MW in China.Anhui Science and Technology Award
2016
-
Launched MBB half cell solar module auto production line ,and build 2.5GW workshop.
2018
-
Won the title "leader" of photovoltaic module ,and Shandong 18MW solar plant were completed.
2019
-
A total of 523 households were successfully connected to the grid throughout the year, and the residents' annual profit reached 22.2%.
2020
-
R&D independently to achieve the reutilization of light absorption and increase energy generation.