• Established in March 2008 in China.

    Received ISO9001/ISO14001 certificates

    2008
  • Obtained TUV certificate in 2010 and build 80MW production line in Jiangsu

    2010
  • Upgraded the construction and expanded its solar module production line from 80MW to 150MW.Sales volume grows constantly

    2012
  • Total module capacity of Nuuko Power exceeded 800MW in China.Anhui Science and Technology Award

    2014
  • Launched MBB half cell solar module auto production line ,and build 2.5GW workshop.

    2016
  • Won the title "leader" of photovoltaic module ,and Shandong 18MW solar plant were completed.

    2018
  • A total of 523 households were successfully connected to the grid throughout the year, and the residents' annual profit reached 22.2%.

    2019
  • R&D independently to achieve the reutilization of light absorption and increase energy generation.

    2020

2008

  • Established in March 2008 in China.

    Received ISO9001/ISO14001 certificates

2010

  • Obtained TUV certificate in 2010 and build 80MW production line in Jiangsu

2012

  • Upgraded the construction and expanded its solar module production line from 80MW to 150MW.Sales volume grows constantly

2014

  • Total module capacity of Nuuko Power exceeded 800MW in China.Anhui Science and Technology Award

2016

  • Launched MBB half cell solar module auto production line ,and build 2.5GW workshop.

2018

  • Won the title "leader" of photovoltaic module ,and Shandong 18MW solar plant were completed.

2019

  • A total of 523 households were successfully connected to the grid throughout the year, and the residents' annual profit reached 22.2%.

2020

  • R&D independently to achieve the reutilization of light absorption and increase energy generation.

Home

Products

about

contact